Friday, 17 January 2014

Here we have a selection of pictures from a site we recently attended that were having ' some network issues'

can you spot the non-standards compliance installed parts of this network?


spot any cable managements bars here for the back of the panels?

Who had a screwdriver to terminate?



How much slack should be left in the back box?


do reckon they ought to have squeezed the patch lead in there?



Have you seen the latest cable clips?



best till last, the cabinet, should be able to close that door with a good shove!



Suffice to say this one was interesting!  and is now reterminated both ends using cable sock, right angle patching panels, as space was tight in the cabinet and all patch leads replaced.

No comments:

Post a Comment